Hi all
I’m needing some advice on how best to plot the
following. I have a table of dates. I would like a graph showing the
progress of work completed.
For example a bar chart that shows the first part
of the project as red between this one date and another then on the
same bar blue to show that the second part of the project was
completed between this date and the next and so on.
I know you cant plot a table of dates however I
was hoping there is a way of doing this or something similar maybe
using a pivot table. I don’t know who to use a pivot table so
instructions would be welcomed.
If you cant think of anything then any suggestions
who to display this large about of data in one graph would be great.
Many Thanks
Possible something like this but with dates as oppose to percentages
[ATTACH=CONFIG]59057[/ATTACH]